CONSTRUCTION OF THE EXPANSION OF THE BALLON LOOP AT BRUCUTU AND OF THE COSTA LACERDA PATIO, AND CONSTRUCTION OF A NEW RAILWAY STATION – VALE

Project
Expansion of the balloon loop at Brucutu; duplication of the way and of the tunnel between Patio 8 and Costa Lacerda Patio; expansion of the Costa Lacerda Patio, including Signage services and the construction of the Housings and Patio’s new station.
Final Client
Vale
Contracting Party
Vale
Location
Santa Bárbara/MG
Period of contract
December/2005 to December/2008
Scope of Reta services
Planning Management and Control.
Description
51 km of Railway
1 tunnel – 290 meters long
1 Highway Bridge
6 railway bridges
1 highway viaduct