DIKE 2, FLOAT AND NORTH STERILE STACK – aNLG

Datasheet
Civil works for the construction of a sediment retention dam in Mina Serra do Sapo (Dike 2), access to relocation of reclaimed water (Float) and expansion of the North Sterile Stack.
Final Client
Anglo America
Contracting Party
Integral Engenharia
Location
Conceição do Mato Dentro/MG
Period of contract
October/2015 to March/2017
Scope of Reta services
Management of the Dynamic Construction Planning System and Participation in Executive Management.
Description 
Earthworks: 613.652 m³
Concrete: 6.755m³
Constructed area: 292.418 m²
Draining material: 58.884 m³